首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于模糊环境下面向能源互联网多种储能项目建设决策研究
引用本文:乌云娜,张婷,伊力奇.基于模糊环境下面向能源互联网多种储能项目建设决策研究[J].科技管理研究,2021,41(3):164-169.
作者姓名:乌云娜  张婷  伊力奇
作者单位:华北电力大学经济与管理学院,北京102206;华北电力大学经济与管理学院,北京102206;华北电力大学经济与管理学院,北京102206;华北电力大学经济与管理学院,北京102206
基金项目:国家社会科学基金重点项目“大数据背景下复杂大型建设项目政府投资监控机理、方法及策略研究”(19AGL027)、中央高校基本科研业务费专项“大数据背景下复杂大型建设项目政府投资监控机理、方法及策略研究”(2020MS066)、2017年创新基地培育与发展专项“京津冀大气污染防治效果协同监管机理研究”(Z171100002217024)资助项目;
摘    要:随着能源互联网的提出,传统能源系统本质上的缺陷如各能源间协调性及其建设性质等问题可得到有效的解决。而储能作为能源互联网的重要组成部分,其运行效果分析和投资决策是支撑能源互联网绿色可持续发展的关键环节。因此,对储能电站选择的合理建设投资决策进行深入研究。首先,运用文献阅读与专家讨论方法,建立储能性能综合评价指标体系。在此基础上,考虑标准值的模糊性和评价环境的不确定性,建立一个高效的储能运行效果评价模型,并对能源互联网中的潜在储能设备进行综合评价从而实现面向互联网的储能建设决策。

关 键 词:能源互联网  储能  建设投资决策  多属性决策
收稿时间:2020/5/18 0:00:00
修稿时间:2020/6/9 0:00:00

Research on the Construction Decision of Varied Energy Internet Storage Projects based on the Fuzzy Environment
Wu Yunna,Zhang Ting,Yi Liqi,Wu Chenghao.Research on the Construction Decision of Varied Energy Internet Storage Projects based on the Fuzzy Environment[J].Science and Technology Management Research,2021,41(3):164-169.
Authors:Wu Yunna  Zhang Ting  Yi Liqi  Wu Chenghao
Institution:(School of Economics and Management,North China Electric Power University,Beijing 102206,China)
Abstract:Along with the rapid development of traditional energy system, the obstacle from its essence as the coordination of varied energy sources and the nature of its construction are more and more obvious and greatly affecting the further improvement of energy efficiency. To solve this essential problem, energy internet is proposed. Besides, the operation effect analysis and investment decision of energy storage project are the critical parts to support the green and sustainable development of energy Internet. Thus, rational construction investment decision making of energy storage plant selection as a necessary and important problem to be solved in the preliminary planning stage is studied in this paper. Firstly, based on literature review and expert consultation, a comprehensive energy storage performance evaluation criteria system is established. Following that, an effective performance evaluation framework is built to rank the potential energy storage plant for energy internet considering the fuzziness of the criteria value and uncertainty of the evaluation environment. Synthetic evaluation on the promising and representative energy storage plant is conducted by the framework proposed in this paper. Thus, this study expands the knowledge and contributions to the literature.
Keywords:energy internet  energy storage  construction investment decision making  multi criteria decision making  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《科技管理研究》浏览原始摘要信息
点击此处可从《科技管理研究》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号