首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
教育   1篇
  2006年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
Strain Monitoring and Stress Analysis of a Post-Prestressed Tunnel Liner   总被引:2,自引:0,他引:2  
The strain monitoring and stress analysis of a new type of post-prestressed tunnel liner were carried out. The instrumentation block of the tunnel liner, with the dimensions of 12.06 m in length, 6 500 mm in diameter, and 650 mm in thickness, was post-prestressed with the unbonded tendons, each of which consists of 8 pieces of double-looped strands and the axial spacing of the tendons is 500 mm. Concrete strain meters, rebar meters, load cell and zero-stress meters were installed for the strain monitoring. The tensioning loads were applied incrementally in three cycles (50%, 77% and 100%) at the concrete age of 28 d and the tensioning work lasted for 187.1 h. Strain readings were taken before and after each cycle during tensioning period and at the specified time interval after tensioning period. It is found that concrete creep developed over tensioning period is 30% of total strain and 41.5% of elastic strain respectively. Prestress force in the unbonded tendon and concrete stress in the liner were evaluated according to the observed strain variations. Both of them are time-dependent, and about 5.3%, 8.3% and 9.0% of the prestress losses are observed at the age of 1 d, 30 d and 60 d respectively after stressing. The distribution of prestress in the liner is relatively uniform and meets the design requirement.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号