首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
教育   4篇
  2012年   1篇
  2008年   1篇
  2007年   1篇
  2004年   1篇
排序方式: 共有4条查询结果,搜索用时 15 毫秒
1
1.
In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.  相似文献   
2.
The dynamic securityregion(DSR) is definedas are-gionininjectionspacein whicha power systemwill betran-siently stable for a given fault[1].The DSRis usually de-noted asΩd(i,j,F) ,whereiandjdenote the networkstructures of pre-fault and post-fault ,respect…  相似文献   
3.
The models, methods and their application experiences of a practical GIS (geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems, termed CNP, are described. In each subsystem there is at least one or one set of practical mathematical methobs. Some new models and mathematical methods have been introduced. In the development of CNP the idea of cognitive system engineering has been insisted on, which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively. Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation, analysis and graphic drawing burden can be released considerably.  相似文献   
4.
The security constrained distributed optimal power flow (DOPF) of interconnected power systems is presented. The centralized OPF problem of the multi-area power systems is decomposed into independent DOPF subproblems, one for each area. The dynamic security region (DSR) to guarantee the transient stability constraints and static voltage stability region (SVSR) constraints, and line current limits are included as constraints. The solutions to the DOPF subproblems of the different areas are coordinated through a pricing mechanism until they converge to the centralized OPF solution. The nonlinear DOPF subproblem is solved by predictor-corrector interior point method (PCIPM). The IEEE three-area RTS-96 system is worked out in order to demonstrate the effectiveness of the proposed method.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号