皮带煤仓转载工程施工体会
引用本文:高芝波,王玉贵.皮带煤仓转载工程施工体会[J].河北能源职业技术学院学报,2004,4(2):69-71.
作者姓名:高芝波  王玉贵
作者单位:开滦钱家营矿业分公司,河北,唐山,063301;河北能源职业技术学院,河北,唐山,063004
摘    要:本文介绍了开滦钱家营矿业分公司八采区皮带煤仓转载工程的卸载硐室、煤仓、给煤机硐室的施工工艺,采用合理、先进的施工方案,实现了安全、优质、高效。

关 键 词:卸载硐室  煤仓  给煤机硐室  交叉施工
文章编号:1671-3974(2004)02-0069-03
修稿时间:2004年3月11日

The Experience of A Constructing Transfer Building with Belt Conveyers and Coal Bunker
GAO Zhi-bo,WANG Yu-gui.The Experience of A Constructing Transfer Building with Belt Conveyers and Coal Bunker[J].Journal of Hebei Energy Institute of Vocation and Technology,2004,4(2):69-71.
Authors:GAO Zhi-bo  WANG Yu-gui
Institution:GAO Zhi-bo WANG Yu-gui
Abstract:In this article, the writers explain the constructing technology of unloading gallery, coalbunker and loading gallery that make up a transfer building In The Eighth Coal District of Qianying Coal Mine of Kailuan Group Company. It had been adopted that rational and advanced constructing project so that the safety, high quality and efficient work had been gained in production.
Keywords:unloading gallery  coal bunker  loading gallery  alternate work