既有复线增建涵洞工字钢扣轨施工技术
作者单位:中铁二十局集团四公司 山东青岛266101
摘    要:株六复线贵阳枢纽C标增建二线线下工程,在既有路基处增建新建涵洞(采用明挖施工),设计要求采用P43钢轨加固线路,行车速度不能大于15km,但实际上路基处于曲线半径R=500及坡比是i=1.2%上坡地段,行车速度不低于45km,故采用P36工字钢取代P43钢轨做纵梁,进行扣轨加固施工。

关 键 词:施工技术  既有复线  增建涵洞  工字钢扣轨

The Construction Technique of Building Out Culverts with Steel I-beam on the Original Double Pipeline
Peng Qu. The Construction Technique of Building Out Culverts with Steel I-beam on the Original Double Pipeline[J]. , 2006, 0(Z1)
Authors:Peng Qu
Affiliation:The 4th Engineering Company of the 20th Bureau of China Railway Qingdao Shandong 266101 China
Abstract:The C coordinate of Guiyang hinge in Zhuliu double pipeline need build out the construction of below-the-line. That is the new culvert construction on the original roadbed (adopting the open cut construction). This design requires P43 rail pinning up the line. The speed should be with 15km. However, actually, in the uphill sector when curve radius R= 500 and the gradient I= 1.2%, the speed should be no less than 45km, therefore, we should adopt the P36 steel I-beam in the carling construction instead of the P43 rail to connect and pin up the construction.
Keywords:construction technology original double pipeline culvert construction skein bloom rail