摘 要: | Olympic preparation in full swingJiang Xiaoyu, vice president of the 2008 Olympics Organizing Committee, announced the Beijing Games preparation had been into full swing since June 2003.Design chosen for swimming centerA Sino-Australian joint plan was chosen as the design for the National Swimming Center, a major venue for the 2008 Beijing Olympic Games.Sydney-based PTW Architects and engineering company Ove Arup Pty. Ltd. designed the 17,000-seat stadium with China State Construction Engineering Corps.
|