某商住楼施工技术 |
| |
引用本文: | 周巧. 某商住楼施工技术[J]. 大众科技, 2012, 0(6): 106-107 |
| |
作者姓名: | 周巧 |
| |
作者单位: | 广西海河水利建设有限责任公司一分公司,广西 宾阳 530409 |
| |
摘 要: | 施工段接槎处应做剔凿处理,并用气泵清理干净,尤其是靠近摸板的接槎处,不得留有混凝土渣子。浇水湿润后浇筑混凝土,保证接槎严密。
|
关 键 词: | 商住楼 技术工艺 施工 |
Construction Technique of a Business-living Building |
| |
Abstract: | The joint place of construction section should do the tick chisel processing,and cleaned-up it clean with air pump,especially the joint place near the formwork,shall not leave the concrete scum.after watering it wet and pouring concrete,so ensure the tight joint. |
| |
Keywords: | Business-living Building technique and technology Construction |