Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation
作者姓名:宋洋  钟炜
作者单位:School of Civil Engineering Tianjin University,School of Civil Engineering Tianjin University,Tianjin 300072 China,Tianjin 300072 China
摘    要:The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.

关 键 词:隧道工程  建设进度分析  进度管理  可视化模拟  资源优化  风险分析
收稿时间:2006-05-24

Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation
SONG Yang,ZHONG Wei.Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation[J].Transactions of Tianjin University,2007,13(2):131-136.
Authors:SONG Yang  ZHONG Wei
Abstract:The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.
Keywords:visual simulation  resource optimization  risk analysis  real time management  S curve