首页 | 本学科首页   官方微博 | 高级检索  
     检索      

超前支护措施在隧道施工中的应用及效果评价
引用本文:许有俊,毛海东,李东奎.超前支护措施在隧道施工中的应用及效果评价[J].中国科技信息,2006(6):155-156.
作者姓名:许有俊  毛海东  李东奎
作者单位:内蒙古科技大学建筑与土木工程学院,014010
摘    要:以沪蓉国道主干线父子关隧道的施工过程为例,介绍了超前支护措施的应用。根据监测结果,总结了超前支护措施在通过软弱岩层时的作用。

关 键 词:超前支护  隧道  施工  效果评价

The application and Result evaluation of Run-before Protection measures during the tunnel construction
Xu YouJun;Mao HaiDong;Li DongKui.The application and Result evaluation of Run-before Protection measures during the tunnel construction[J].CHINA SCIENCE AND TECHNOLOGY INFORMATION,2006(6):155-156.
Authors:Xu YouJun;Mao HaiDong;Li DongKui
Abstract:Taking an example of the construction process of FUZIGUAN tunnel which lines in the Hugung national highway main artery, this paper introduces the application of Run--before Protection measures. According to the monitored results, it sums up the functions of run--before protection technology in passing through weak rocks.
Keywords:Run--befor  e Protaction  Tunnel  construction  Resultevaluation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号