牛头山水电厂黑启动方案拟定
引用本文:徐海英,叶圣玲.牛头山水电厂黑启动方案拟定[J].江西电力职业技术学院学报,2011,24(2):23-26.
作者姓名:徐海英  叶圣玲
作者单位:1. 福建水利电力职业技术学院,福建永安,366000
2. 福建闽东股份有限公司寿宁发电分公司,福建寿宁,355500
摘    要:以牛头山水电厂为研究对象,提出中小型水电厂黑启动方案,以最快的速度实现水电厂自救及向电网送电,恢复电网安全运行.通过试验比较,结合牛头山水电厂实际运行方式,制定有效的牛头山电厂黑启动方案.

关 键 词:水电厂  厂用电  黑启动  试验  方案

Original Start-up Scheme Selecting for the Hydro Power Plant of Mount Niutou
XU Hai-ying,YE Sheng-ling.Original Start-up Scheme Selecting for the Hydro Power Plant of Mount Niutou[J].Journal of Jiangxi Vocational and Technical College of Electricity,2011,24(2):23-26.
Authors:XU Hai-ying  YE Sheng-ling
Institution:XU Hai-ying1,YE Sheng-ling2 (1.Fujian College of Water Conservancy and Electric Power,Yong,an 366000,China,2.Shouning Generation Branch of Fujian Mindong Co.,Ltd.,Shouning 355500,China)
Abstract:Based on the research target of hydro power plant of Mount Niutou,this paper puts forward the original start-up scheme for small and medium-sized hydro power plant,which could achieve the faster self hydropower supply and transmission to the power system that runs properly again,works out effectively original start-up scheme for the hydro power plant of Mount Niutou through the experiment.
Keywords:hydro power plant  power used in power house  original start-up  experiment  scheme  