锦屏电站大坝右岸洞室开挖过程控制及对策
引用本文:胡治中,刘涛,刘艳兰.锦屏电站大坝右岸洞室开挖过程控制及对策[J].长江工程职业技术学院学报,2009,26(2):44-45,48.
作者姓名:胡治中  刘涛  刘艳兰
作者单位:陆水枢纽工程局,湖北,赤壁,437302
摘    要:锦屏一级水电站大坝右岸地下洞室具有地质条件复杂、施工条件差、干扰因素多、难度大、工程量大、质量要求高、工期紧等诸多特点,因此施工过程控制极其重要。

关 键 词:平面多工序  立体多交叉  钻孔  爆破

Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
HU Zhi-zhong,LIU Tao,LIU Yan-lan.Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam[J].Journal of Changjiang Engineering Vocational College,2009,26(2):44-45,48.
Authors:HU Zhi-zhong  LIU Tao  LIU Yan-lan
Institution:HU Zhi-zhong,LIU Tao,LIU Yan-lan(Lushui Project Management Bureau,Chibi 437302,China)
Abstract:The engineer in Jinping first stage hydropower station cavern,with a complicated geological situation,is with a terrible construction condition,messy interference factors,huge difficulty,large amount of engineering,high demand on qualities and construction period.So the process control is of great importance.
Keywords:plane multi-procedure  stereoscopic multi-cross  drilling  explosion  